Answer first: approve finishes by exact model and component, not by one colour name
A useful finish approval identifies the exact model, room or BOQ line and every visible component being reviewed. A label such as walnut or grey is not enough when the main panel, visible edge, side cabinet, workstation screen, handle and cable accessory may follow different references.
A website image is a reference, not a finish approval. Every material or colour decision should name the sample or written reference being reviewed, its current status and the quotation or drawing revision that will control the order.
Use plain states such as reference only, physical sample requested, under review, approved sample reference recorded or written quotation basis recorded. This prevents an importer, dealer, fit-out contractor or project buyer from treating an early screenshot, forwarded image or old swatch as the final production instruction.
- Exact model, room or BOQ line and quantity or release batch
- Primary panel, visible edge, matching storage, screen or fabric and hardware listed separately
- Reference only — not approved
- Physical sample requested or under review
- Approved sample reference recorded with model and revision
- Written quotation finish basis recorded
- Repeat-order basis identified but reconfirmed before production
Build a component-level finish matrix before asking for approval
Start one row from the exact model and repeat the finish basis for each component that the buyer will see or match. If a component is not included, mark it not applicable; if its tone, texture or accessory finish is still open, mark it pending. Do not let one approved desktop swatch silently approve a side cabinet, privacy screen, handle or cable cover that was never compared.
For coordinated executive rooms, workstation zones, meeting rooms or reception packages, repeat the same component labels on every affected model line. This makes differences between a deliberate contrast and an accidental mismatch visible before quotation revision, drawing approval or sample release.
- Main worktop, modesty panel and leg or frame finish
- Visible edge treatment and direction on exposed faces
- Pedestal, return, side cabinet or back-storage matching basis
- Workstation screen, fabric or acoustic-panel reference where applicable
- Handles, cable covers, grommets and other visible hardware finish
- Status for each line: confirmed reference, pending sample or not applicable
Start with one exact model, material basis and finish reference
Material and colour confusion usually starts before production, when the buyer is discussing one office desk, workstation or cabinet model with several different woodgrain photos, showroom memories or old quote files. A useful office furniture RFQ needs one active reference for the exact BG model, the material basis being discussed and the finish or colour direction that belongs to that same record.
Open the confirmation trail from the exact model number, selected size where relevant, current material description, finish code or named swatch if available, and the buyer role using the goods. Importers, dealers, fit-out contractors and project buyers in Africa, the Middle East, Central Asia and Southeast Asia often need this step before they can compare alternatives, combine rooms into one BOQ or ask for a written quotation without mixing unrelated samples.
- Exact BG model number and selected size or orientation
- Current material basis stated on the active quote or product record
- Finish code, named colour or swatch description kept on the same note
- Room, dealer assortment or project area using the selected finish
- Open items still needing sample, photo or written confirmation
Separate website guidance from final sample approval
A sourcing website can explain what buyers should confirm, but it cannot turn a screen image into a final finish approval. Phone displays, printouts and forwarded images often shift colour, and one woodgrain family can include several tones or texture directions that look similar until the sample is checked against the actual buying file.
Use the website to organize the sample-confirmation checklist, then keep the final commercial basis on the approved sample, written finish record or confirmed quotation revision. If a buyer still needs to compare laminate tone, edge treatment, handle colour, screen fabric or hardware finish, record that as pending instead of pretending the choice is already locked.
- Website image used only as a sourcing reference
- Approved sample, swatch or written finish record identified
- Edge detail, hardware finish and accessory colour checked with the same model
- Pending colour or material comparisons kept visible before approval
- Final order basis tied to the dated quotation or approval note
Keep sample confirmation aligned with BOQ, drawings and repeat orders
Finish consistency becomes harder when the same project uses executive desks, workstations, meeting tables, storage and reception counters across several rooms or phases. If the BOQ, drawing set and sample note do not repeat the same material and colour basis, the buyer may ask for one tone while production follows another revision.
Before approving production or repeat purchasing, repeat the model line, room or area, finish basis, related accessories and the revision date on one control note. That gives buyers a usable trail for RFQ review, room planning, sample approval and later repeat orders without claiming that every option shown online is already commercially confirmed.
- Room or BOQ line tied to the selected finish basis
- Drawing or approval revision repeated on the same dated record
- Matching storage, meeting or reception pieces checked for finish consistency
- Accessory items such as screens, handles and cable parts reviewed together
- Repeat-order requests linked back to the approved sample basis
Build one component-level finish approval brief.
Keep the exact model and room line beside the primary panel, visible edge, matching storage, screen or fabric and hardware finish. The next page carries this brief into BG's RFQ form so each open difference stays visible before written review.
Related verified pages
- Move from sample review to a usable approval checklist ↗
- Check whether related models truly share the same finish basis ↗
- Control what happens if the finish changes after approval ↗
- Keep finish decisions aligned with the room-and-model BOQ ↗
- Request office furniture material and finish confirmation support ↗
Turn the guide into a model quotation.
Send model numbers or a room schedule, quantities, destination and timing. BG will confirm the next commercial step.
Prepare an RFQ ↗Frequently asked questions
What should buyers send before asking BG to confirm a material or colour?
Send the exact model number, selected size where relevant, the material or finish reference being considered, the quantity or room use and any sample, swatch, drawing or quotation note already linked to that choice.
Can website photos replace a physical or written sample confirmation?
No. Website photos help identify the sourcing direction, but final finish, tone, texture and accessory matching still need approval through the written quotation trail, the confirmed sample basis or both.
Why should finish confirmation stay linked to the BOQ or room schedule?
Because mixed room sets and repeat orders often fail when the finish note is separated from the exact model lines and room references that the factory is expected to follow.
Does approval of one panel swatch approve matching storage, screens and hardware?
Not automatically. List the main panel, visible edges, storage pieces, screens or fabric and visible hardware separately, then record which reference and approval status applies to each component.